Civil engineering and building technic

Peculiarities of ventilating of the Lviv Opera Hall

Oksana Kinash

Abstract

Lviv State Academic Opera and Ballet Theatre of Solomiya Krushelnitska is a peculiar building being of special importance for the architecture and culture of the city of Lviv. The building was designed by Zygmund Gorgolewski, an outstanding architect of his time, in 1897 [2], and was erected in 1900. The bulk of the Opera auditorium is 4374 m2, the auditorium has room for 1000 spectators. The stage part of the theatre also has significant dimensions, being equipped with modern technologies with moving platforms.

The project of ventilation and heating systems of the theatre building was done by engineer Władysław Niemersz from Austrian designing firm “Johanes Haag” in 1897 in Vienna [6]. One of the projects of modernizing ventilation, central heating and temperature electrical regulation systems was developed in 1903 by Lviv engineering company “Michalski and Hupert” specializing in health recreation equipment [7]. Another project of reconstructing ventilation and central heating systems as well as their partial automatic control was developed in 1977 [8].

The initial project provides for systems of direct flowing mechanical plenum-exhaust ventilation of the auditorium and the stage, recirculation mechanical plenumexhaust ventilation of these main premises and the system of their thermostimulating (natural) ventilation.

For example, the system of mechanical direct flowing (without recirculation) plenum ventilation operates in the following way (Fig. 1). Due to rarefaction created by ventilator W1, the external air from the on-land cylindrical air collector, distanced from the building, flows through the underground duct, then through filter F1 with duct F closed, goes through distributed horizontal underground (under-floor) ducts and flows into four (six) vertical ducts that are shown in the plan of the basement (Fig. 2, 3).

Full article view is only available on bigger screens.